Hyderabad ORR: Information, Connectivity, Efficiency, and More

Hyderabad Outer Ring Road Project Information, Connectivity and Status

Hyderabad Outer Ring Road (ORR) Project – Information, Connectivity and Status  

The 158-kilometer Hyderabad Outer Ring Road spans 6,250 acres. The 8-lane ring road expressway connects 33 Radial Roads, 20 Interchange Junctions, and the Inner Ring Road. Telangana launched the "Hyderabad Growth Corridor Limited" SPV to build the HMDA's ORR. The road linked to NH 44, shortening travel from Rajiv Gandhi International Airport to Nizamabad and Adilabad. 

ORR has 19 exit gates, namely: 

  1. Gandipet 

  1. Edulanagulapally 

  1. Patancheru 

  1. Sultanpur 

  1. Saregudem 

  1. Kandlakoya 

  1. Shamirpet 

  1. Keesara 

  1. Ghatkesar 

  1. Taramatipet 

  1. Pedda Amberpet 

  1. Bongulur 

  1. Raviryal 

  1. Tukkuguda 

  1. Pedda Golkonda 

  1. Shamshabad 

  1. Rajendranagar 

  1. TSPA (TSPA) 

  1. Narsingi 

EFKON India built 157 Manual and Touch 'n Go lanes, 23 Electronic Toll Collection (ETC) lanes, 648 surveillance system cameras, 404 kilometres of optical fibre cable (OFC), and Network/WAN/LAN at 676 points on the ORR. Excellent EFKON toll plazas are at every ORR interchange. 

Key Goals: 

  • Connecting NH, State Highway (SH), and other major city routes quickly connects key city nodes and metropolitan areas beyond the city. 

  • Consider bypassing through traffic on national and state roads to decrease accidents and avoid city commercial traffic. 

  • Decreased congestion on urban and inner ring roads 

  • Minimize city pollution and enhance the environment.